Board Minutes February 2020: Difference between revisions
Jump to navigation
Jump to search
→North Shop Lease negotiations - Jeremy (20 min)
| Line 92: | Line 92: | ||
*** Mezzanine could take the space of the current outdoor storage at the North shop | *** Mezzanine could take the space of the current outdoor storage at the North shop | ||
*** Pretty much move-in ready; could direct people to the backroom, not keeping any merchandise in the front area | *** Pretty much move-in ready; could direct people to the backroom, not keeping any merchandise in the front area | ||
*** | *** A 3-month timeline to move, set-up, get people in the doors would be quite tight. Should have time buffer in case things don't work out exactly as planned. | ||
*** Would likely lose about half of volunteers due to location shift | |||
*** To regain traffic from south shop move, it took 1.5 years | |||
*** Permitting would be easier if not doing renovations | |||
*** Without needing to take down walls or doing renovations, could transform space in a month (estimate) | |||
=== Board Volunteer Hour Tracking - Jasmine (10 min) === | === Board Volunteer Hour Tracking - Jasmine (10 min) === | ||