Board Minutes May 2018: Difference between revisions
Jump to navigation
Jump to search
→BWN lease renewal - Jon (15 min)
| Line 75: | Line 75: | ||
* Landlord offered EBC a space in the same building: 1255 ft^2, garage door in the back, yard space 3/4 size of existing yard, 2-3 parking stalls | * Landlord offered EBC a space in the same building: 1255 ft^2, garage door in the back, yard space 3/4 size of existing yard, 2-3 parking stalls | ||
** Size may be inadequate for bike sales and workshop space | ** Size may be inadequate for bike sales and workshop space | ||
* | * BWN shift to streetfront unit | ||
** Being right on 111 Ave might increase BWN visibility, and attract new clients | ** Being right on 111 Ave might increase BWN visibility, and attract new clients | ||
** Location is still set-back from road, door access is not from the sidewalk | ** Location is still set-back from road, door access is not from the sidewalk | ||
* Any way to combine the two units | |||
* Goal of moving BWN wasn't for more space; goal was to increase revenue potential | |||
=== Name change updates - Chris (15 min) === | === Name change updates - Chris (15 min) === | ||