Board Minutes October 2010: Difference between revisions

Jump to navigation Jump to search
Line 56: Line 56:
fee if needed.
fee if needed.


'''8:35''' BikeWorks Guide. Timeline update.
'''8:35''' BikeWorks Guide. Timeline update: content of the guide is finished.  Guide needs formatting and distributing.  Should be completed before Christmas.


'''8:45''' Alberta Cycle building as second workshop location. November 16th deadline. Space available in the short and long term. We want a north side shop. Discussion of cost of second shop in terms of
'''8:45''' Alberta Cycle building as second workshop location. November 16th deadline. Space available in the short and long term. We want a north side shop. Discussion of cost of second shop in terms of
48

edits

Navigation menu