Board Minutes September 2012: Difference between revisions

 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
These minutes are not yet approved.
These minutes were approved in the [[Board Minutes October 2012]].


== EBC Board Meeting Minutes for September 12, 2012 ==
== EBC Board Meeting Minutes for September 12, 2012 ==
Line 49: Line 49:
*Delay in announcing new BW director was owing to a wait from Coreen on her bio to go with it.
*Delay in announcing new BW director was owing to a wait from Coreen on her bio to go with it.
*Most media mentions positive to neutral (as result of memorial ride/critical mass)
*Most media mentions positive to neutral (as result of memorial ride/critical mass)
*People on Connect2 Edmonton forum are talking about Chris's presentation on Velocity, activism!
*People on the Connect2 Edmonton forum are talking about Chris's presentation inspired by Velo-City
*Sustainable Transportation simply wants to continue building bike lanes despite Chris' research and discussion with ST.  Separated bike lane would necessitate removing 2 lanes.  They're not against it; it's political.
*Sustainable Transportation simply wants to continue building bike lanes despite Chris' research and discussion with ST.  Separated bike lane would necessitate removing 2 lanes.  They're not against it; it's political.


Line 57: Line 57:
*Actual report to be completed.
*Actual report to be completed.
*Need to finish BWN flooring as condition of our lease; Neil says we have a budget.
*Need to finish BWN flooring as condition of our lease; Neil says we have a budget.
=== Committee Report ===
[[Committee Report September 2021]]
*None.


== Old business ==
== Old business ==
Line 102: Line 97:
[[Category:minutes]]
[[Category:minutes]]
[[Category:2011-2012 Board minutes]]
[[Category:2011-2012 Board minutes]]
[[Category:2012-2013 Board minutes]]