Board Minutes October 2019: Difference between revisions
→Draft Budget Review - Chris (30 min)
Line 151: | Line 151: | ||
** Add a second bike builder | ** Add a second bike builder | ||
*** Risks could be lack of space for storage and lack of bike sales once bikes are built up (but low risk because bikes can be sold later if not immediately) | *** Risks could be lack of space for storage and lack of bike sales once bikes are built up (but low risk because bikes can be sold later if not immediately) | ||
*** Generally, bike builders pay for themselves through the improved bike sales | |||
=== North Shop Lease Renewal - Jeremy/Mike S. (30 min) === | === North Shop Lease Renewal - Jeremy/Mike S. (30 min) === |