Board Minutes December 2015: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 27: Line 27:
** [http://www.savethefootbridge.com/ savethefootbridge.com] and [https://www.facebook.com/savetheyegdtfootbridge/ facebook.com/savetheyegdtfootbridge/]
** [http://www.savethefootbridge.com/ savethefootbridge.com] and [https://www.facebook.com/savetheyegdtfootbridge/ facebook.com/savetheyegdtfootbridge/]
** In Nov, Eric reached out to EBC. SEDF wrote a [http://www.savethefootbridge.com/alternative-route/ report summarizing the concerns] about the Southeast LRT route.
** In Nov, Eric reached out to EBC. SEDF wrote a [http://www.savethefootbridge.com/alternative-route/ report summarizing the concerns] about the Southeast LRT route.
** Chris wrote: "I've reviewed this report in detail. We still have to formulate our own position. We'd certainly favour saving the footbridge if possible (it's a great community space, something the LRT replacement surely won't be, and of course the access and disruption is critical), but LRT route options are beyond our core expertise. We'll definitely be discussing this, though."
** Chris wrote: "I've reviewed this report in detail. We still have to formulate our own position. We'd certainly favour saving the footbridge if possible but LRT route options are beyond our core expertise."
** SDF: "We are still urging the City to alter the river crossing portion of the Valley Line, and also to explore options such as Bus Rapid Transit. We have gotten the support of five community leagues (Riverdale, Rossdale, Boyle Street, Grovenor, and Belgravia.) It would be with the hope EBC would support either a review of the Valley Line, or an alternative route."  
** SDF: "We are still urging the City to alter the river crossing portion of the Valley Line, and also to explore options such as Bus Rapid Transit. We have gotten the support of five community leagues (Riverdale, Rossdale, Boyle Street, Grovenor, and Belgravia.) It would be with the hope EBC would support either a review of the Valley Line, or an alternative route."  
* Discussion:
* Discussion:
**  
**  
**
**


== Logistics for Next Meeting ==
== Logistics for Next Meeting ==
Line 51: Line 50:


=== Executive Director's Report - Chris Chan ===
=== Executive Director's Report - Chris Chan ===
*[ED Report (Month) (Year)]  
* [https://docs.google.com/document/d/1NuVk6Fywi4Qsdet1Av3xxNJ7apv-fRtG-meXnMc_ZB8/edit Executive Director Oct 2015 report] - submitted Nov 7 by Chris
* [https://docs.google.com/document/d/1SIBPMtwYha2E46siiVliHJjOSTr3PmRueoeNXHbArR0/edit?ts=563d2a2a#heading=h.y02w35ymbf3n Program Coordinator Oct 2015 report] - submitted Nov 6 by Molly
* [Executive Director Nov 2015 report]


=== H.R. Committee Report - Nancy ===
=== H.R. Committee Report - Nancy ===