Board Minutes July 2019: Difference between revisions
→Signage at BikeWorks North - Sarah (15 min)
Line 152: | Line 152: | ||
=== Signage at BikeWorks North - Sarah (15 min) === | === Signage at BikeWorks North - Sarah (15 min) === | ||
* [https://drive.google.com/drive/u/2/folders/1EXAS_MZKL-dq8ITyNkW1FpYr3f0Eg5tq North Shop Signage 2019] | * [https://drive.google.com/drive/u/2/folders/1EXAS_MZKL-dq8ITyNkW1FpYr3f0Eg5tq North Shop Signage 2019] | ||
* Presenting mock-ups for BWN signage | |||
* Connected with employee of Pioneer Press (printing company); suggested to get it printed on a single decal | |||
* Could try to match with black background, or have white background to pop a bit more | |||
* Colours are flexible - Sarah can make more adjustments, as needed | |||
* Complement the awning with an A-frame or sandwich board to draw attention to the shop | |||
* Cost of Pioneer Press is a fraction of initial quote | |||
* Three types of visual promo for BWN are front signage (dibond), side awning, and sandwich boards | |||
** Preference would be for side awning and a sandwich board | |||
=== Schedule a time to meet with your committees - ALL BOARD (10 min) === | === Schedule a time to meet with your committees - ALL BOARD (10 min) === |