Board Minutes October 2016: Difference between revisions
→Guest Speaker: Occupational Health & Safety Plan for BikeWorks (10 min)
Line 39: | Line 39: | ||
** Dan: training, alarm system, communication system, standard drill and plan (e.g. fire drill) | ** Dan: training, alarm system, communication system, standard drill and plan (e.g. fire drill) | ||
** Dan: also things like muster point | ** Dan: also things like muster point | ||
** Dan: size of workplace includes staff+volunteers+members, up to maximum occupancy of each shop | ** Dan: size of workplace includes staff+volunteers+members/patrons, up to maximum occupancy of each shop | ||
** Nancy: need to get sub-committee from HR in order to help implement this with staff | |||
** Jon + many others: living on borrowed time here, and this is overdue given the exposure that we have. | |||
** Nancy: we need to do our best job given our capacity, doesn't have to be gold standard of industry | |||
** Jon: some action in time for retreat? | |||
** Geoff: biggest job is list of hazards | |||
** Nancy: biggest change is culture change | |||
** Chris: agree with Nancy. Less control in EBC compared to most workplaces. Hybrid retail environment with lots of volunteers, can be hard to train even main volunteers | |||
** Nancy: safety/OHS can be a volunteer opportunity. | |||
** Jon closes @ 7:16 | |||
== Logistics for Next Meeting == | == Logistics for Next Meeting == |