Board Minutes March 2017: Difference between revisions
→New Business Item 2: PEEPS (Pilot EBC/ESA Partnership) (20 min)
Derekpluim (talk | contribs) |
Derekpluim (talk | contribs) |
||
| Line 119: | Line 119: | ||
Jeremy, do we need an MOU? | Jeremy, do we need an MOU? | ||
Jonathan (not present) had previously suggested that the survey could be given to the entire EBC volunteer membership and volunteer base. | |||
Geoff, so you want to run with this, on behalf of EBC without asking for many additional resources. Great. | |||
Nancy, what is the nature of the certificate? Michael, the letter is yes, they did 40 hours that we tracked, then what they do with that is up to the student through the reflection. | |||
Next steps (proposed): | Next steps (proposed): | ||
| Line 132: | Line 133: | ||
{{Motion | {{Motion | ||
|motion= To approve the PEEPS pilot initiative in principle. Starting with the form going out to Ed students. | |motion= To approve the PEEPS pilot initiative in principle. Starting with the form going out to Ed students. | ||
|first= | |first= Derek | ||
|second= | |second= Geoff | ||
|yes= | |yes= 9 | ||
|no= | |no= | ||
|abstain= | |abstain= | ||