Board Minutes December 2014: Difference between revisions
Jump to navigation
Jump to search
Anna Vesala (talk | contribs) |
Anna Vesala (talk | contribs) |
||
Line 97: | Line 97: | ||
** Chris C: Grant Writing into SP Committee? Jon: Open to changes. Nancy: There is a draft TOR for SP, and Nancy met with Kristen and Steve for plans for policy that are needed. | ** Chris C: Grant Writing into SP Committee? Jon: Open to changes. Nancy: There is a draft TOR for SP, and Nancy met with Kristen and Steve for plans for policy that are needed. | ||
** Geoff: Grant Writing, IT, Treasurer = Operations (additional committee)? Acknowledge that this is contrary to Policy Board but may fit. Nancy: We thought this would work closely with Treasurer... Jon: Flexibility in this initial categorization but we wanted to ensure that each role has support from other board members. | ** Geoff: Grant Writing, IT, Treasurer = Operations (additional committee)? Acknowledge that this is contrary to Policy Board but may fit. Nancy: We thought this would work closely with Treasurer... Jon: Flexibility in this initial categorization but we wanted to ensure that each role has support from other board members. | ||
** Anna: Concerned that HR Committee and Terms of Reference (TOR) has currently a large focus on staff... Jon: Committee TOR will trump Director's particular position/point of view | ** Anna: Concerned that HR Committee and Terms of Reference (TOR) has currently a large focus on staff... Jon: Committee TOR will trump Director's particular position/point of view | ||
* <span style="background: lime;">Action Items:</span> '''Anna''' will post new positions on website. | |||
== Current & Completed Business == | == Current & Completed Business == |