Board Minutes October 2012: Difference between revisions

 
Line 46: Line 46:


=== Executive Director's Report ===
=== Executive Director's Report ===
[https://docs.google.com/a/edmontonbikes.ca/document/d/1JojKeOZVgKCte6scACSVdskc_IFxg8bzLUtHt0SmjE8/edit Executive Director Report October 2012]
[https://docs.google.com/a/edmontonbikes.ca/document/d/1B6t5j87QmmbIFDj7ynxXFZs1sJd1BCEv-p7Pq6r8t1E/edit Executive Director Report October 2012]
We discussed it.
We discussed it.
*Can we cut hot water tank and rewire?  Pretty complicated.  Gas heated but ignition etc needs to be wired.
*Can we cut hot water tank and rewire?  Pretty complicated.  Gas heated but ignition etc needs to be wired.